Factory Power Calculator: How Many Amps Do You Need?

List your machines or enter your total load. The calculator converts kW to amps on a TNB 400 V three-phase supply, adds room to grow and shows factories with enough power.
An electrician checking a factory main switchboard and its load

Built by Adam

Adam is an industrial property negotiator with a software engineering background. He built BuyKlang.my and its spec tools himself, so buyers and tenants can shortlist factories by power supply, ceiling height and floor loading before the first viewing.

About Adam →

How the calculation works

  1. Connected load: the kW of every machine, multiplied by how many you have.
  2. Running load: the connected load multiplied by the share that runs at the same time.
  3. Current: amps = kW x 1,000 / (1.732 x 400 x power factor). At a power factor of 0.85, 1 kW is about 1.7 A.
  4. Supply to look for: the current plus your spare capacity, rounded up to the next common supply size seen on factory listings.

Reading the amperage on a factory listing

Factory listings in Malaysia state the incoming supply in amps, for example 300 A or 1,000 A three phase. A 300 A supply is about 208 kVA, enough for roughly 177 kW of load running together. The figure usually comes from the owner, so confirm it on the main switchboard, the TNB meter and a recent bill before you sign.

Factories by power and other specs

FAQ

How many amps does my factory need?

Add up the kW of all your machines, multiply by the share that runs at the same time, convert to amps and add room to grow. For example, 150 kW of machines with 80% running together at a power factor of 0.85 draws about 204 A on a 400 V three-phase supply. With 25% spare capacity that is about 255 A, so look for a factory with at least 300 A.

How do I convert kW to amps for a three-phase supply in Malaysia?

Amps = kW x 1,000 / (1.732 x 400 x power factor). TNB low-voltage supply is 400 V three phase, so at a power factor of 0.85 each kW draws about 1.7 A. 100 kW is therefore about 170 A.

What does a 300A three-phase factory supply mean?

A 300 A supply at 400 V three phase is about 208 kVA. At a power factor of 0.85 that runs roughly 177 kW of load at the same time. The amperage on a factory listing is the size of the incoming supply, not what the current tenant uses.

Is the amperage on a factory listing always accurate?

Not always. It usually comes from the owner or the original listing. Before you sign, check the main switchboard, the TNB meter and a recent TNB bill, and have your electrician confirm the incoming supply.

What if the factory does not have enough power?

The supply can often be upgraded through a registered electrical contractor and a TNB application, but it can take months and the cost varies. Large loads may need a substation on site. Agree in writing who pays and how long it will take before you sign.

Does this calculator replace an electrical engineer?

No. It is a quick estimate to shortlist factories. The final supply size must be worked out by a registered electrical engineer and approved by TNB.

← Tools

Talk to the agent directly

Tell us what you need or what you want to sell or let. We usually reply within hours.

Watch the short video

The lease was signed and the new machine arrived, then the electrician said the factory did not have enough power. A TNB upgrade can take months. Before you sign: - Add up your machines' kW and convert to amps: at a power factor of 0.85, 1 kW is about 1.7 A - The amps on a listing usually come from the owner, so check the main switchboard, the TNB meter and a recent bill - If the supply needs an upgrade, agree in writing who pays and how long it takes Use the BuyKlang factory power calculator to see how many amps you need.

YOUR NEXT CONVERSATION

Who would you
like to speak to?

Your brief is ready. Choose a contact to review it in WhatsApp.

Adam+60 17-672 9873Yuki+60 16-772 4476

No message is sent until you send it in WhatsApp.